Short answer: before a new website goes live, check six things. The words and details are right, every form and phone link works, it's quick and usable on a phone, Google can see it, nothing from the old site has been lost, and the legal basics are in place. Most launch problems are small and boring, a broken form or a page hidden from Google, and they're far cheaper to catch the day before launch than three months after. Here's the full list we work through, which you can use whoever built your site.

Launch day is when things slip through. Everyone's tired of looking at the site, the designer wants to move on, and you just want it live. Then a fortnight later someone mentions the contact form hasn't sent anything since launch.

This checklist is grouped so you can split it up. Some of it you can check yourself in ten minutes. Some of it you should ask your web designer to confirm. Tick it off before you announce the new site to anyone.

A broken contact form doesn't show an error. It just stops the phone ringing.
The checklist
  1. Content and details
  2. Forms and contact
  3. Phone and speed
  4. Google and search
  5. If it replaces an old site
  6. Legal and accessibility
  7. The first week after launch
Part 1

Content and details

Part 2

Forms and contact

Part 3

Phone and speed

Part 4

Google and search

Part 5

If it replaces an old site

Our guide to moving a site without losing your rankings covers redirects and email in detail.

Part 6

Legal and accessibility

Part 7

The first week after launch

Want someone to check it for you?

We built this list from the checks we run before our own Zenlio Local sites go live. If someone else built your site and you'd like a second pair of eyes before launch, book a free 15-minute call and we'll tell you what we'd check first.

Keep reading: Website jargon explained: a plain-English glossary · How a website redesign works · How long does it take to build a website? · Your website might have a twin